2011-2012 - todo

  • Build boat shed – done once, underway a second time!
  • Fix engine exhaust – underway
  • Recore cabin top – done
  • Prep and paint decks – underway
  • Replace windows – underway
  • Prep and paint topsides – underway
  • Replace electrical system – underway
  • Evaluate running rigging – underway
  • Purchase and assemble running rigging
  • Purchase large volume bilge pump (already have small one)
  • Install bilge pumps
  • Evaluate all through-hulls and seacocks, rationalize and replace as needed
  • Gut cabin
  • Build propane locker
  • Install propane
  • Install toe rail
  • Install pulpits, stanchions, life lines
  • Install deck hardware
  • Evaluate mast and standing rigging
  • Reassemble mast and standing rigging
---

---