Weather plays a role

Today I spent the first part of the day clearing out the space under the long table that I built to make the bows on, so that I could move the wood they’re built out of inside. An unusually early snow, as well as several weeks with below-freezing temperatures overnight made me realize that if the wood wasn’t brought in I’d likely find myself unable to get pieces off of the pile when I needed them.

So in it came, as you can see.

After shoveling out the wood for the bows

Cleared out under the bow building table for wood storage

Wood stored

Other than that I got three more bows, for a total of 8 constructed.

Bow in progress

8 down, 42 to go.

---

---